Note and industrial requirements for briquette machine
(1) Host (mechanical molding)
Before starting the machine, check whether the electrical parts are normal. Check the alignment of the die holes of the two rollers. If not, open the gear cover, loosen the six screws on the dial of the driven gear, turn the passive roller forward and reverse to align the die holes of the two rollers, and tighten the screws. The working roller spacing should be maintained between 0.4-0.7mm. If it is too large or too small, loosen the passive roller and the bearing and wire drawing, adjust it, and after adjusting, tighten the screw and wire drawing.
After starting production, check whether the working surfaces on the double rollers are matched. If there is an error, remove the large gear cover and loosen the screws on the outer ring of the passive roller gear to adjust.
(2) Host (Hydroforming)
First check whether the electrical appliances are working properly and whether the turning of the profile roller and hydraulic mercury is forward. Then check whether the die holes of the two rollers are aligned. The distance between the two rollers should be between 0.4-0.7mm. If they are too large or too small, they should be adjusted. If the two-roller die holes are out of alignment, the gear cover should be opened, loosen the six screws of the adjustment disk on the driven gear, turn the adjustment forward or reverse, and tighten the screws after adjustment. If the distance between the two rollers is large or small, it should be adjusted by the passive (movable) shaft and the four adjusting wires on both sides of the driving wheel. After everything is normal, the mechanical oil should be added to the reducer. Add hydraulic oil to the hydraulic mercury tank. Start-up pressure test means that the bottom of the pressure adjustment is 11MPa and the high adjustment is 13MPa. After everything is normal, you can start the test machine for production.
(3) Blender
If the clutch slips during production, the fixing wire on the three-jaw frame can be loosened for adjustment, and the angle of the mixing blade on the two shafts can be adjusted according to the output to ensure the material used by the host.
If you need to add accessories (dipping, waterproof), you can add in the mixer.
(4) Conveyor
During normal operation, it is necessary to ensure that the belt does not deviate. If the belt is not correct, the front and rear roller bearings and the top thread can be adjusted.
(5) Feeder
Turn on the belt first to adjust the elasticity of the belt. The belt must not be misaligned. Then adjust the size of the gate according to the production capacity of the molding machine, so that the amount of feed is not too much.
Industrial requirements
1. The material size can be between 90-260 mesh.
2. No metal objects are allowed in the material. Otherwise, the surface of the roller skin will be damaged.
3. The material supply must be satisfied, and a screw feeder with adjustable speed should be used to observe the amount of material returned to adjust the supply of new material.
4. Be sure to fill the machine after a few weeks of empty operation before feeding. In order to prevent the ball-pressing machine from eating too much, which causes overload to the reducer and the motor, the roller of the ball-pressing machine is twisted.
Luoyang Yujie Industry &Trade Co.Ltd located in the Luoyang City , one of the main heavy industrial bases in China. We specialize in the production of bearing , non standard machinery parts, and assembling equipment. If you have any interests, feel free to contact us and we warmly welcome customers and friends visit us